Shasta College Computer Information Systems Building
For this small but technical computer information systems facility, our team provide Fire Sprinkler Design services for a wet-pipe Sprinkler system that covered the majority of the spaces and we also provided a Double Interlock Pre-Action system for their more sensitive areas.
Both systems were designed to be both functional and aesthetically pleasing. By working collaboratively with the SEOR on this project, we were able to provide an integrated pipe support system in the exposed structure rooms that blended the pipe supports into the buildings structural design.
The Double Interlock Pre-Action system provides the areas that it serves with an extra layer of safety against accidental discharge, which their IT team really appreciated.
Owner
Shasta-Tehama-Trinity Joint Community College District
Location
Redding, CA
Architect
JK Architecture
Project Value
$6,000,000
Project Area
12,000 SF
Completion Date
2021
Services
DSA
Fire Suppression Engineering
Mechanical Engineering
Plumbing Engineering